Power & Energy

 

 

P&J’s experience in the energy industry dates back to the 1950s.  
Our Power/Energy Group specializes in clearing land, building access roads
and pads, installing storm drainage and erosion control, installing mats, and working in environmentally sensitive areas.

 

Contact: 
P&J Power/Energy Group • Wendell Durham, VP • 813.783.1132 • wdurham@pandj.com 

 

Brochure: 
Click to download the Power/Energy Group brochure (PDF file)

 

 

 

Southern Loop Project

Multiple Counties, Vermont
This project was a 53 mile 345kV transmission line starting at the Vermont Yankee Nuclear Facility in Vernon and ending at Owner's existing Coolidge substation on the Cavendish/Ludlow town line.  In addition, there is an approximately one mile loop line (Newfane Loop), which extends to the proposed Newfane substation.

The SLP 345kV transmission ...
>> READ MORE

Meadowbrook to Loudoun 500kV Transmission Line

Warren County, Appalachian Trail, Virginia
This project consisted of clearing for the construction of a new transmission circuit and the related cutting of danger trees outside the rights-of-way.  Clearing extended through three (3) counties in Virginia and varies in width from 100 to 75 feet.  Work included:  clearing wetlands and uplands (cutting, pulpwood disposal, sawtimber piling, and ...
>> READ MORE

Arizona Public Service Co. 500-L Transmission Line Vegetation Management

Various, Arizona
Philips and Jordan, Inc. was contracted by Arizona Public Service Co. to perform 500-L vegetation management for a lump sum price.  This included cutting the vegetation and the danger trees along the ROW.  The ROW clearing covered a distance of 367 miles.
>> READ MORE

Rockingham West End

Richmond County, North Carolina
P&J performed Right-of-Way clearing on the Rockingham – West End 230kV East Line and Biscoe – Rockingham 230kV transmission line that was relocated due to expansion plans.  Rockingham-West End work included: clearing of ROW and removal of danger trees for approximately 0.33 miles of new 230kV steel single and H-Frame overhead transmission line.  Pr...
>> READ MORE

Kibby Mountain Wind Farm

Franklin County, Kibby and Skinner Townships, Maine
P&J performed powerline ROW clearing and access road construction for this wind farm project.  The access road passed through environmentally sensitive wetlands, matted roadway (wooden) was utilized for these areas.  A total of 24,000 LF of mats were installed.  P&J also delivered and spotted 450 power poles for Trans-Canada Wind Energy.
>> READ MORE

Orlando Utilities Commision, Stanton Energy Center, 115kv Line ROW

Orange County, Orlando, Florida
P&J performed the construction of approximately 1,720 lineal feet of at grade access road, four at grade structure pads, and one raised structure pad. This included clearing and grubbing of approximately 6 acres, with 5 acres in a low lying area, and 1 acre of wetland that had to be hand cut and removed. Vegetative debris generated was chipping, ha...
>> READ MORE

Pioneer Prairie Wind Farm Phase 2

Howard and Mitchell Counties, Iowa
Phillips and Jordan, Inc. performed site development for the collector sub-station on Phase 2 of this project.  Once the ground grid and sub-station equipment were installed P&J placed stone over the entire site. P&J also performed Phase 1 of this project.
>> READ MORE

Pioneer Prairie Wind Farm T-Line

Howard and Mitchell Counties, Iowa
Phillips and Jordan, Inc. performed land clearing and access road construction for a wind farm collector sub-station.
>> READ MORE

Pioneer Prairie Wind Farm Phase 1

Howard and Mitchell Counties, Iowa
Phillips and Jordan, Inc. performed site development for the collector sub-station on Phase 1 of this project.  Once the ground grid and sub-station equipment were installed P&J placed stone over the entire site. P&J was also awarded Phase 2 of this project, under a separate contract.
>> READ MORE

Cumberland-Montgomery 500KV Transmission Line Project

Montgomery and Cumberland Counties, Tennessee
Phillips & Jordan, Inc. did right of way clearing on 525 acres for a 500 kV transmission line over rough terrian in Montgomery and Cumberland Counties, TN for the Tennessee Valley Authority.    We installed 141 gates  and fencing for farmland use.  P&J constructed acess roads for the line crew, including installing 2,480 foot of culvert.  Finally, ...